Henry Lawson Drive - Stage 1B
Independent Verification – Health and Safety in Design
The Henry Lawson Drive Upgrade Stage 1B will provide more capacity for vehicles travelling through Henry Lawson Drive between Milperra Road / Newbridge Road and the M5 Motorway. The Henry Lawson Drive Upgrade – Stage 1B will improve efficiency along the corridor and safety for motorists and pedestrians between Auld Avenue and the M5 Motorway at Milperra.
Client
Project Description
Scope of Engagement
Aurecon
Services
Independent Verification – Health and Safety in Design
Axess is providing Independent Verification (IV) of the Health and Safety in Design (HSiD) processes undertaken and outputs produced by the technical advisor, in compliance with Work Health and Safety legislation as embodied in the Safe Work Australia Code of Practice: Safe Design of Structures. As the IV will review supporting HSiD project documentation to produce a HSiD IV Report and HSiD Certificate.